Contact

SERVICES Overview

Control Devices From Design to Delivery — Total Coordination

This service integrates the design of multiple components and delivers them as a fully assembled and inspected “complete unit.”
By consolidating orders under a single supplier and a single part number, it significantly reduces the man-hours required for prototype validation, procurement, assembly, and yield management.

UNIT Product Introduction

  • design
  • Line of Products
  • Assembly
    (assembly)
  • Inspection Management
  • Evaluation

design

Product Design
Electrical design
Product design

Sensor Sheet

Capacitive Sensor
Sensor

Flexible Switch

Membrane Switch
Click feeling

Screen Printing

Panel (processing details)
Special Decoration
Ingredients

Sheet metal and metal nameplates

Metal nameplate (decorative)
Ingredients

molded product

Resin molding
Mold type
Compatible resins

substrate

Implementation

シ ー ル

Seal printing (use)
Spec.
Ingredients

Assembly

Documentation
Temporary assembly
Book assembly

Recruitment example

Case study

Inspection Management

Inspection
Documentation
Management

Evaluation

Environmental Testing
Performance evaluation test

MERIT Advantages of unitization

position Issues Solved by Unitization Advantages
Factory/site Labor shortages and risk of defects in assembly processes Labor saving and reduced production loss
Procurement and Purchasing Complicated management of order quantity and lead time/yield management burden Reduce order management workload and inventory
Development / design There are many meetings regarding related parts, and development lead times are long. Reduced meeting time and evaluation man-hours / Proposals from parts to completed units

CASE Unitization example

Assembly unit including 6 molded parts + sheet metal and harness

BEFORE
  • Approximately 20 parts are individually procured and managed.
  • Each part needs to be assembled and inspected
  • Requires specification adjustment and design work
AFTER
  • Approximately 20 components are consolidated in our company → Significant reduction in procurement and assembly man-hours
  • Quality assurance for each unit → No need for warranty for each product
  • No specification adjustment required → Significant reduction in design man-hours

Film insert molding + molding + panel 1 unit

BEFORE
  • Six individual components are ordered, and assembly and inspection are handled in-house
  • Guarantees and quality control are required for each product
AFTER
  • All three components are consolidated in our company → Reduce procurement and assembly time
  • Quality assurance for each unit → No need for warranty for each product

Panel + sheet metal unit

BEFORE
  • Panels and sheet metal are individually arranged and attached on-site
  • Specifications such as punching holes need to be adjusted
AFTER
  • Consolidating two parts at our company → reducing labor hours required for arrangements
  • Delivered pre-assembled → Reduces on-site work hours
  • Design specifications can be coordinated by one company → Reduced design man-hours

PMMA panel + sensor + reflector unit

BEFORE
  • Three separate components must be ordered, and the design work, such as adjusting the lighting, is a major burden.
  • Difficult to handle small lots and high initial costs
AFTER
  • All three components are consolidated in our company → Reduce procurement and assembly time
  • Adjusting the lighting conditions including the reflector → reducing design man-hours
  • Small lot production possible with cutting etc. → Initial cost reduction
Pages
To TOP